From: Experimental study of forces and energies during shearing of steel sheet with angled tools
Parallel | Parallel | 1° rake | 2° rake | |
---|---|---|---|---|
tools, | tools, | angle, | angle, | |
Clearance | 1 clamp | 2 clamps | 1 clamp | 1 clamp |
0.05h | x | x | x | x |
0.10h | x | x | x | x |
0.15h | x | x | x | x |
0.20h | x | x | x | x |
0.25h | x | |||
0.30h | x | |||
0.40h | x | |||
0.50h | x |