Skip to main content

Table 1 Matrix of clearances and rake angles used in the experimental study

From: Experimental study of forces and energies during shearing of steel sheet with angled tools

 

Parallel

Parallel

1° rake

2° rake

 

tools,

tools,

angle,

angle,

Clearance

1 clamp

2 clamps

1 clamp

1 clamp

0.05h

x

x

x

x

0.10h

x

x

x

x

0.15h

x

x

x

x

0.20h

x

x

x

x

0.25h

x

   

0.30h

 

x

  

0.40h

 

x

  

0.50h

 

x